Beechworth Close NW3 7UT
Project Description
A supply and installation of CFA piles for two double-storey houses in Hampstead, London. The project was taken over from a previous piling contractor, who was unable to complete the job.
320 CFA piles were installed in three stages: external piles driven with the piling rig Casagrande, internal piles driven with Tes Car CF3, and the rest of the piles driven with a short-mast drilling rig K40.
Case Details
- Location
- Hampstead | London
- Client
- Private
- What We Did
- CFA piles,Basement,Structure
- Turnaround Time
- 4 months